63 Chevy Nova
63ChevyII.com - Nova Restoration - April 2011
      ⇐ Mar 2011         May 2011 ⇒
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
27
28
29
30
31
1
2
• worked on mounting plate for fuel relay

• tested option 2 for spark plug wire looms

• cleaned up and painted transmission pan

• continued work on wiring



• re-installed firewall pad - removed heater, added peel and seal

• removed throttle linkage for cleanup/painting

• looked for alternative ways to modify mount for radio, fuses, terminal blocks, and relays

  • finished running wires and tested fuel pump wiring (dedicated relay in trunk)

• drilled spark plug wiring loom to accept screws •tidied up and finalized wiring to fuel pump

• re-routed lines for rear speakers, away from power to fuel pump
3
4
5
6
7
8
9
• lockup wiring - figured out and tested, switch added

• removed tranny filter

• prepped & painted throttle assembly

• created list of hardware needed to complete project

• tried installing new transmission filter, but does not fit tight

• took detailed pics of transmission wiring

• added rubber lined loop clamps: to secure light wiring harness in front of radiator, secure light wiring harness along drivers side of engine bay and heater hoses on passenger side
• worked on TV cable again

• figured out tranny filter issues (using new filter with old O-ring);

• installed throttle assembly

• disassembled heater to install new heater core - new core does not fit

• reassembled heater with old core, reinstalled heater in car

• secured transmission cooler lines to chassis

• touch up paint on crossmember

• worked on finalizing under dash wiring

• reassembled starter solenoid

• cut braided fuel line to length
• tried to install trans gasket and filter - new filter interferes with transmission pan

• tried to attach cooler lines to transmission - mission will need to be lowered

• reworked stereo wiring

• finished off fuel line setup

• terminated end for alternator to battery, coolant temp, coil and tachometer and added powerbraid

• tested gauges - oil pressure, tranny temp, coolant temp

• installed radiator and hoses

10
11
12
13
14
15
16
• started modifying old distributor for use as oil pump primer

• marked balancer for TDC
• painted new air cleaner cover

• research options for exhaust/muffler

• installed fender to core support bolts/shims

• prepped and painted grill brackets

• installed grill

• installed headlights

• installed blinkersstarted troubleshooting passenger side light - not getting any power to socket)

• installed new transmission pan gasket, filter and lokar dipstick (needed silicone added)

• attached cooler line hoses to transmission (radiator removed and trans needed to be dropped down)

• reinstalled radiator





17
18
19
20
21
22
23
  • driveshaft cut and installed





24
25
26
27
28
29
30


• final install - themostat spacer, t - housing spacer, waterneck, direct mount temperature gauge
• ordered muffler, y & u bends for downpipes, exhaust tubing
• exhaust tubing flared
• intake & exhaust manifolds final install
• rug trimmed and installed
• finished off fuel pump wiring (powerbraid, securing wires)  
Nova Stickers, Chevy II Stickers