63ChevyII.com - Nova Restoration - April 2010 | |||||||||||||||
|
|||||||||||||||
Sun |
Mon |
Tue |
Wed |
Thu |
Fri |
Sat |
|||||||||
28 |
29 |
30 |
31 |
1 |
2 |
3 |
|||||||||
• prepped gas tank | • found solution for oil pickup | ||||||||||||||
4 |
5 |
6 |
7 |
8 |
9 |
10 |
|||||||||
• old gas tank removed |
• ordered temp gauge •painted gas tank |
• ordered fuel pickup • removed: grill, headlights, horns, front bumper, etc |
• took measurements: hood & radiator clearance • labeled wiring & removed wiring harnesses • removed radiator, manifolds, battery & tray, |
• removed hood
• removed block |
• removed core support • removed wiper motor • prepped engine bay for paint • dropped items off for sandblasting: core support, hood hinges, hood latch assembly, battery tray, engine mounts |
• Engine bay: prepped & painted | |||||||||
11 |
12 |
13 |
14 |
15 |
16 |
17 |
|||||||||
• Oil pan - prepped & painted • Master Cylinder - prepped & painted • Bumper brackets - prepped & painted • Trunk pan - wire brushed and prepped • Modified Oil Pickup Support • Purchased oil pan gasket |
• Purchased bolts: fuel pump, engine mount, thermostat housing spacer • Sandblasting / Powdercoating done: core support, hood hinges, hood latch assembly, battery tray, engine mounts |
• Purchased Rust Converter • Painted trunk pan with rust converter • Engine Bay: prepped and painted 2nd coat |
• Worked on modifying oil support pickup • Prepped gas tank straps for paint |
• Purchased oil pump • Painted gas tank straps • Worked on passenger side motor mount |
• Painted trunk pan - rustoleum and bedliner • Setup Welder • Engine Bay: prepped and painted Final coat |
• Finished modifying oil pickup support • Welded oil pickup to pump • Installed- oil pump, pickup support, oil pan |
|||||||||
18 |
19 |
20 |
21 |
22 |
23 |
24 |
|||||||||
• Installed gas tank & new fuel pickup • Prepped & Painted: wiper motor, starter |
• Installed Side Covers • Installed ARP Valve Cover Studs • Installed Wiper Motor • Ordered: flexplate bolts, radiator, carb spacer, throttle retrun springs • Planning for fuel pump bracket |
• Worked on fuel pump bracket • Cleaned Flexplate and enlarged holes to accept 1/2" x 20 bolts • Cleaned Tranny Parts |
•Temporarily Installed 292, Radiator Core • Worked on Fuel Pump Bracket •Checked Radiator to H2O pump clearance |
• Worked on Fuel Pump Bracket • Finished up passenger side motor mount •Ordered Flexplate |
• Worked on Fuel Pump Bracket |
• Finished Fuel Pump Fabrication • Temporarily mounted alternator, water pump pulley to check pulley alignment |
|||||||||
25 |
26 |
27 |
28 |
29 |
30 |
1 |
|||||||||
• Worked on oil pan problem (5 hrs) • Removed old Fuel lines |
• Worked on oil pan issues |
• Vacation |
• Vacation |
• Vacation |
• Vacation |
• Vacation |